Monday, March 18, 2024 at 6 PM
Online only
This meeting has happened. Minutes are final.
What happened
5 items of legislation were taken up.
- 3 recommended to be marked work completed
- 1 accepted
- 1 kept in committee
Agenda 5 items
Notices from the agenda
The meeting took place virtually via Zoom and was called to order at 6:01 PM by Chair Clingan and adjourned at 6:36 PM on a roll call vote of 3 in favor (Councilors McLaughlin, Strezo and Clingan), none against and none absent. Others present: Arn Franzen – Director of Parks and Open Space, Brian Postlewaite – Director of Engineering, Hannah Carrillo – Legislative Liaison, Peter Forcellese – Legislative Clerk.
(Posted online: 3/9/24 at 7:45 AM)
Pursuant to Chapter 2 of the Acts of 2023, this meeting of a City Council Committee will be conducted via remote participation. We will post an audio recording, audio-video recording, transcript, or other comprehensive record of these proceedings as soon as possible after the meeting on the City of Somerville website and local cable access government channels. Copy & paste the following link into your internet browser to view this meeting live: https://us02web.zoom.us/webinar/register/WN_rrBOhXF0SEOi0nNnxDt8Ew Individuals with disabilities who need auxiliary aids and services for effective communication (i.e. CART, ASL), written materials in alternative formats, or reasonable modifications in policies and procedures, in order to access the programs and activities of the City of Somerville or to attend meetings, should contact Adrienne Pomeroy in advance, at 617-625-6600 x2059 or ada@somervillema.gov.
Roll Call
-
1.
Approval of the Minutes of the Public Utilities and Public Works Committee Meeting of February 12, 2024.
Roll call: 3 aye
- Jesse ClinganAye
- Matthew McLaughlinAye
- Kristen StrezoAye
-
2.
That the Director of Water and Sewer address the use of threatening notifications as part of the water meter replacement project.
-
3.
That the Director of Engineering update this Council on the policy and plans pertaining to repairing leaking gas pipes versus replacing them, and the necessary transition away from gas infrastructure.
{\rtf1\ansi\ansicpg1252\deff0\deflang1033{\fonttbl{\f0\froman\fprq2\fcharset0 Times New Roman;}{\f1\fnil\fcharset0 Times New Roman;}} {\colortbl ;\red0\green0\blue0;} \viewkind4\uc1\pard\nowidctlpar\sl-284\slmult0\qj\tx2760\f0\fs24 Mr. Edward Woll from Mothers Out Front, and a member of Gas Transition Allies, spoke about gas line repair vs. replacement (or triage and transition) and the Future Clean Heat Bill in the MA Legislature that seeks to have gas companies be authorized to get into a new business, i.e., installing non-emitting renewal thermal energy. He noted that Framingham is beginning a pilot program of geothermal networks that utilize non-combustible geothermal energy sources in the next week or so. Mr. Woll also touched upon the DPU\rquote s new vision to transition from gas to thermal energy, non gas pipeline alternatives, funding for continued training of employees, and eliminating depreciation of pipes.\par \par Director Postlewaite said he was prepared to discuss what he could about the Engineering Department\rquote s role with respect to this topic and he noted that Mr. Woll\rquote s remarks were wider ranging than what Engineering can contribute to. The Engineering Department is charged with facilitating the use of public streets for utility work and, by law, cannot favor one type of energy over another. Director Postlewaite commented that he agrees with moving towards less carbon intensive energy systems and said that the Engineering Department is looking at electrification and/or network geo thermal and is hiring a consultant to study decarbonization. He told the committee that there\rquote s a challenge between transitioning to a non-carbon system and maintaining an existing system to the standards required by the DPU.\par \par On the topic of leaking gas pipes, Director Postlewaite noted that the SYSPOT repair system was a challenge because Eversource was incapable of shutting off the gas line due to the legal agreements with customers on that line. Eversource knew they were intending to shut the line at some point so they didn\rquote t want to invest money into it, thus making the SYSPOT repair the best option. Brian doesn\rquote t know if it\rquote s more beneficial to repair or replace gas lines but if the Committee wants more info, a meeting can be arranged to have gas companies attend a future committee meeting.\par \par Councilor McLaughlin said the city could do a better job at publicizing the contact information for the utility companies\rquote liaisons. Lindsay Lucke, from Mothers Out Front, said it\rquote s far less expensive to repair gas pipes rather than to replace them. She would like to see some of the funds that were set aside for repairing pipes go towards alternative methods, e.g., non-combustible fuels rather than replacing pipes.\par \par The Bill, S2103 has been accepted by the state Senate and reported it out favorably but the House has not accepted it yet. It might go to a conference committee and there may be some activity on the bill in April. Ms. Lucke said the first step is to get the bill through the state legislature. Chair Clingan commented that the city has little sway over what utility companies are doing and passage of the Future Clean Heat Bill will the give city some tools to proceed. \par \pard\cf1\f1\par }
-
4.
That the Administration and the Director of Water and Sewer update this Council, in writing, on the plan to support residents who cannot afford the recent water bill increases.
{\rtf1\ansi\ansicpg1252\deff0\deflang1033{\fonttbl{\f0\froman\fprq2\fcharset0 Times New Roman;}{\f1\fnil\fcharset0 Times New Roman;}} {\colortbl ;\red0\green0\blue0;} \viewkind4\uc1\pard\nowidctlpar\sl-284\slmult0\qj\tx2760\f0\fs24 Liaison Carrillo informed the committee that the Administration will be making a presentation on this topic at the March 20\super th\nosupersub Housing and Community Development Committee meeting.\par \pard\cf1\f1\par }
-
5.
That the Commissioner of Public Works re-install the bench, previously donated and installed in honor of longstanding Brown School principal Marilyn Haggerty, on the Brown School grounds.
{\rtf1\ansi\ansicpg1252\deff0\deflang1033{\fonttbl{\f0\froman\fprq2\fcharset0 Times New Roman;}{\f1\fnil\fcharset0 Times New Roman;}} {\colortbl ;\red0\green0\blue0;} \viewkind4\uc1\pard\nowidctlpar\sl-284\slmult0\qj\tx2760\f0\fs24 Director Franzen told the committee that a new bench will be provided for Brown School. A quote has been received and a purchase will follow. A dedication plaque will be placed on the back of the bench, which will be mounted on concrete pad. The estimated time for delivery is 6-8 weeks. Councilor Strezo requested that this item remain in committee until the bench is installed.\par \pard\cf1\f1\par }