School Building Facilities and Maintenance Committee

Tuesday, October 6, 2026 at 6 PM

Online only Joint Meeting with the School Committee's School Building Facilities and Maintenance Committee

Outcome: Outcome: Accepted prior minutes; recommended marking work completed on Kennedy School inclusive playground turf snow clearing, Edgerly cafetorium and kitchen cooling, and Argenziano School safety upgrades (cameras, fencing, balconies); kept in committee MSBA updates on Winter Hill and Brown Schools and Somerville High exterior tile concerns.

This meeting has happened. Minutes are final.

What happened

6 items of legislation were taken up.

  • 3 recommended to be marked work completed
  • 2 kept in committee
  • 1 accepted

Agenda 6 items

Notices from the agenda

Referenced Documents: • SBFM - 2026-10-06 Memo AFA Balcony (with 26-0710)

(Posted online: 10/1/26 at 6:30 AM)

This meeting was held virtually via Zoom and was called to order at 6:01 pm by Chair Link and adjourned at 6:49 pm with a roll call vote of 2 in favor (Councilors Sait and Link), none opposed, and 1 absent (Councilor Scott). Others present: Leiran Biton - School Committee Member, Laura Pitone - School Committee Member, Elizabeth Eldridge - School Committee Member, Richard Raiche - Infrastructure and Asset Management Director, Eric Weisman - Department of Public Works Commissioner, Danielle Barry - Facilities, Safety and Transportation Coordinator, Richard Raiche - Director of Infrastructure & Asset Management, Luisa Oliveira - Director of Public Space and Urban Forestry and Delaney Fisher-Cassiol - Clerk of Committees The committee went into recess at 6:04 pm and returned at 6:06pm on a roll call vote of 2 in favor (Councilors Sait and Link), none opposed, and 1 absent (Councilor Scott).

Roll Call

  1. 1.
    26-1384 Committee Minutes Accepted

    Approval of the Minutes of the School Building Facilities and Maintenance Committee Meeting of September 8, 2026.

    Roll call: 2 aye · 1 absent
    • Jefferson Thomas (J.T.) ScottAbsent
    • Naima SaitAye
    • Jon LinkAye
  2. 2.
    26-0842 Resolution Recommended to be marked work completed

    That the Director of Public Space and Urban Forestry consider snow clearing requirements to maintain inclusive winter use when selecting turf materials for the new Kennedy School inclusive playground.

    {\rtf1\ansi\ansicpg1252\deff0\deflang1033{\fonttbl{\f0\fnil\fcharset0 Times New Roman;}} {\colortbl ;\red0\green0\blue0;} \viewkind4\uc1\pard\cf1\f0\fs24 School Committee Member Leiran Biton noted that there is more to discuss regarding communication with school families so that all members of the community impacted by storms understand the timeline for snow removal and how areas are prioritized. IGA Director Amanda Nagim-Williams reviewed the maintenance plan, which includes three phases: phase one occurs immediately during and after a storm and involves plowing and shoveling snow near schools; phase two focuses on drop-off areas, parking areas, ADA ramps, and snow piles; and phase three includes schoolyards, parks, additional parking areas, and snow piles. She noted that there is not a way to remove snow from poured-in-place rubber surfaces and that the City has been in communication with neighboring communities about this issue.\par \par Councilor Sait referenced the previous discussion about options for allowing students to continue playing in the snow without requiring all of the snow to be removed. Eric Weisman, Commissioner of the Department of Public Works (DPW), noted that DPW tries to remove as much snow as possible and is working with schools to clarify which areas snow can be removed from and which areas cannot be touched. Commissioner Weisman noted that the City is considering options for both snow play and accessibility and that all Somerville schools have an identified space that can be plowed for winter play.\par }

  3. 3.
    26-0841 Order Recommended to be marked work completed

    That the Commissioner of Public Works provide an update on the improvements made to the temperature in the Edgerly Education Center Cafetorium and kitchen following the installation of the air conditioning unit.

    {\rtf1\ansi\ansicpg1252\deff0\deflang1033{\fonttbl{\f0\fnil\fcharset0 Times New Roman;}} {\colortbl ;\red0\green0\blue0;} \viewkind4\uc1\pard\cf1\f0\fs24 Eric Weisman, Commissioner of the Department of Public Works, noted that on the last hot day, staff were able to put the air conditioning unit to the test and it performed well. The City will transition to heat over the next week.\par }

  4. 4.
    26-0710 Order Recommended to be marked work completed

    That the Commissioner of Public Works and the Director of Infrastructure and Asset Management update this Council and the School Committee about safety improvements to security cameras, enclosed schoolyard fencing, balconies, and other infrastructure at the Argenziano School.

    {\rtf1\ansi\ansicpg1252\deff0\deflang1033{\fonttbl{\f0\fnil\fcharset0 Times New Roman;}} {\colortbl ;\red0\green0\blue0;} \viewkind4\uc1\pard\cf1\f0\fs24 Danielle Barry, Facilities, Safety and Transportation Coordinator, reviewed the attachment \i SBFM - 2026-10-06 Memo AFA Balcony (with 26-0710) \i0 and noted that there have been no issues. Principal Soto is happy with the current balcony, which meets all safety and OSHA requirements. At this time, they do not believe any additional steps need to be taken, but they will continue to monitor it.\par }

  5. 5.
    26-0241 Resolution Kept in committee

    That the Administration provide the Committee on School Building Facilities and Maintenance with regular updates on the Massachusetts School Building Authority (MSBA) process for the Winter Hill and Brown Schools.

    {\rtf1\ansi\ansicpg1252\deff0\deflang1033{\fonttbl{\f0\fnil\fcharset0 Times New Roman;}} {\colortbl ;\red0\green0\blue0;} \viewkind4\uc1\pard\cf1\f0\fs24 Richard Raiche, Director of Infrastructure and Asset Management, noted that the Somerville Public Schools administration and the design team met with the Facilities Assessment Subcommittee (FAS) and discussed the ambitious nature of the plan. He noted that the biggest questions were related to maintenance, particularly for the rooftop areas. The project will go before the full Board on October 28, 2026, and is progressing on schedule.\par }

  6. 6.
    26-1452 Order Kept in committee

    That the Director of Infrastructure and Asset Management present on continued concerns related to exterior tiles on the Somerville High School building, and provide updates on measures to identify and mitigate those concerns.

    {\rtf1\ansi\ansicpg1252\deff0\deflang1033{\fonttbl{\f0\fnil\fcharset0 Times New Roman;}} {\colortbl ;\red0\green0\blue0;} \viewkind4\uc1\pard\cf1\f0\fs24 Richard Raiche, Director of Infrastructure and Asset Management, noted that staff continue to monitor the issue. A tile was found leaning under the windowsill of the third-floor library. The subcontractors were on site within an hour to secure the tile and returned the following week to remove it. The tile was chipped at the location where the metal clips hold it in place. Staff shared photos with the manufacturer of the tiles and clips, who noted that the failure was not consistent with what they typically see. Director Raiche noted that similar issues tend to occur in September, so staff initially considered whether temperature could have been a factor, but the manufacturer indicated that thermal expansion is accounted for in the system. The contractor, Sunrise, will manufacture new brackets to serve as restraints for the tiles, which will be installed around the building windowsills. Staff are also looking into using a drone for future inspections and may come before the Council to request permission for its use.\par }